A Data, DVLA
Location: SwanseaValue: £600,000
Main Contractor: Kier Western
Commenced: October 2007
Scope of Works:
Installation of high bay (6M high) and heavy gauge SFS to provide blast resistance within the external facade together with the installation of the insulated render system which was coloured and banded to suit the new refreshed look to the DVLA centre Swansea.










